Bridgeport Kitchen Fire

 
By Assistant Chief Matthew Curll
November 3, 2026
 

This past Sunday night around 8:30 PM Squirt 56 was dispatched with the Bridgeport Fire Department for a dwelling fire on the 10 block of W. Fourth St. in the borough. Shortly after dispatch the fire was upgraded to the Working Fire also adding Rescue 56-3 due to multiple calls.

Squirt 56 arrived as the first due engine and stretched an attack line to extinguish a kitchen fire. Rescue 56-3 arrived and was assigned to the Charlie side for horizontal ventilation before conducting primary searches of the attached exposure building. Rescue 56-3 operator also refilled SCBA cylinders during the call. Traffic 56 responded and assisted with traffic control around the scene. Crews from Swedesburg operated for 2 hours before being released.

Photos are courtesy of Powercall Photos and Tappan Firephotos. See less

 
Units: SQ56, R56-3, TR56